Assumptions & limitations
This is a dated snapshot of stored records from the connected controller. Collection sends no fitting tests, firmware updates or commissioning commands. Other controllers and physical fittings may be outside this capture.
Each non-deleted fitting identity is counted once. Outcome groups do not overlap. Unidentified records remain in the evidence and total; they do not establish an additional physical fitting. Communication status reflects stored information, not a live physical inspection.
Duration assessment uses scheduled tests of at least 90 minutes. A successful runtime must meet both 90 minutes and the recorded pass limit, with a successful test within six calendar months. The latest duration attempt takes precedence; an earlier pass does not override a later failure or inconclusive attempt. Short tests remain in the download but do not establish a duration pass. This does not verify initial commissioning requirements.
Failed, inconclusive, offline and overdue outcomes need different follow-up. Inconclusive results alone do not diagnose a failed battery. Stored clocks, missing history, stale communication, duplicate or conflicting records and incomplete collection can limit the assessment.
Parts catalogue matches are candidates only. Suitability, replacement quantities and stock need verification before ordering. Firmware compatibility and upgrade readiness require a separate engineering review.
Site names are editable labels; controller MAC identity controls matching. Data stays on this LachNex device until downloaded; saving does not upload it. Downloads retain historical evidence. This view does not replace on-site inspection, mandatory servicing, lighting design assessment or physical compliance certification.